Thomas Bar + Counter Stool: Bar + Carbon Stained Ash + Gold Chrome
Thomas Bar + Counter Stool: Bar + Carbon Stained Ash + Gold Chrome
Thomas Bar + Counter Stool: Counter + Walnut Stained Ash + Black Chrome
Thomas Bar + Counter Stool: Counter + Walnut Stained Ash + Black Chrome
Thomas Bar + Counter Stool: Counter + Natural Ash + Metallic Pewter
Thomas Bar + Counter Stool: Counter + Natural Ash + Metallic Pewter
Thomas Bar + Counter Stool: Counter + Walnut Stained Ash + Black Chrome
Thomas Bar + Counter Stool: Counter + Walnut Stained Ash + Black Chrome
Thomas Bar + Counter Stool: Counter + Walnut Stained Ash + Black Chrome
Thomas Bar + Counter Stool: Counter + Walnut Stained Ash + Black Chrome
Thomas Bar + Counter Stool: Counter + Walnut Stained Ash + Black Chrome
Thomas Bar + Counter Stool: Counter + Walnut Stained Ash + Black Chrome
Thomas Bar + Counter Stool: Bar + Carbon Stained Ash + Gold Chrome
Thomas Bar + Counter Stool: Bar + Carbon Stained Ash + Gold Chrome
Thomas Bar + Counter Stool: Bar + Carbon Stained Ash + Gold Chrome
Thomas Bar + Counter Stool: Bar + Carbon Stained Ash + Gold Chrome
Thomas Bar + Counter Stool: Bar + Carbon Stained Ash + Gold Chrome
Thomas Bar + Counter Stool: Bar + Carbon Stained Ash + Gold Chrome
insitu
insitu
insitu
insitu

SP01 × Metrica

Thomas Bar + Counter Stool

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

$1,210

SKU: SP01-TB65-A02C-G01G

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB65-A06W-G01G

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB65-A02C-G02B

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB65-A06W-G02B

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB75-A02C-G01G

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB75-A06W-G01G

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB75-A02C-G02B

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB75-A06W-G02B

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB65-A02C-E02K

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB65-A02C-F02P

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB75-A02C-E02K

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB75-A02C-F02P

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB65-A01N-F02P

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB65-A01N-G01G

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB65-A01N-G02B

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB75-A01N-F02P

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB75-A01N-G01G

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB75-A01N-G02B

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB75-A01N-E02K

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB65-A01N-E02K

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB65-A06W-E02K

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB65-A06W-F02P

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB75-A06W-E02K

Average lead time: 14-16 weeks

$1,210

SKU: SP01-TB75-A06W-F02P

Average lead time: 14-16 weeks


Description

Thomas’ sleek chair profile also makes a fine template for comfortable bar or counter seating. With its formed plywood shell suspended in a solid-ash frame, the barstool adds a metal footrest in a choice of finishes. Fashioned from environmentally certified timber, it's made in Italy for Australian-based global brand SP01. 

Specifications

Size

  • Counter: 33.7" h x 20.7" w x 18.3" d (85.5x52.5x46.5cm)
    • Seat height: 25.6" (65cm)
  • Bar: 37.6" h x 20.7" w x 18.3" d (95.5x52.5x46.5cm)
    • Seat height: 29.5" (75cm)

Material

Solid ash, plywood, metal

insitu
insitu

Brand

SP01

“One of the reasons that we wanted to start SP01 was because we didn't want to be siloed into one kind of ‘Italian’ or ‘Danish’ or ‘Japanese’ style—we wanted to be a bit more flexible,” says SP01 co-founder Matt Lorrain of the design brand that features beautifully detailed, hand-finished furniture conceived in Australia and designed and made in Italy. “If you look at some of our pieces, there are subtle references to mid-century, Art Deco, or even something a little ‘80s,” he adds. “We try to lightly touch on these things but without being ‘retro’ or gimmicky.”

Production in Italy is key to the brand’s mantra of rigorous design and the honest use of materials. “Working with Italians is quite a beautiful thing because they have an atelier-style approach to things and they’re specialists. We do a lot of wood production, for example, but the people who make tables aren’t the same people who make chairs,” Matt explains. “One workshop will work with another workshop and another workshop, and they’ll take joint responsibility to make sure that in the end you get a perfect product.” With tables and seating for both indoors and out as well as sleek storage pieces, SP01’s “perfect product” is as relevant in a New York studio as in a beachside home in California.


More from SP01

SP01

Yee Storage System: Composition G

$7,495 – $8,140

SP01

Yee Storage System: Composition I

$7,915 – $8,760

SP01

Chee Chair: Set of 2

$890

SP01

Holland Short Bench with Backrest: Upholstered

$3,050 – $3,895